Replacing studs one at a time on a live flange is now covered by a new PCC-1-2026 Appendix G. Before that work is considered, the owner checks for conditions that rule it out. This page summarizes those checks. It is a pre-check, not a procedure. A printable PDF (PB-TD-221) is below. Values are for reference; confirm against the current edition of the governing standard. Send us your bolting list for a quote or call (281) 581-0176.
Related: Bolt and Nut Reuse Guide · Sour Service Bolting Quick Reference · Relaxation and Retorque Passes · All technical docs
Stop: conditions that rule out SSR (Table G-6-1, paraphrased)
- Studs next to the one being replaced are corroded below the limit in App G.
- Bolting is susceptible to environmental cracking, for example B7 in caustic, hydrogen or sulfide service.
- Compressed fiber or organic-binder sheet gaskets, which can be brittle.
- The system is in a transient condition.
- Tapped holes with short effective length, unless the user approves.
- Cryogenic service is generally not recommended.
Basic rules (G-3, G-4)
- A risk assessment team decides. App G gives a scoring method for likelihood of leakage.
- Never have more than one stud out at a time. Finish each stud once started.
- At least 8 bolts, unless analysis or a clamp supports fewer.
- For a leak, turn-of-nut tightening is the first option before SSR.
- Use new studs for on-stream leak work; reuse only cleaned and inspected studs otherwise.
- Hydraulic tools can be problematic above 212°F.